Not enough space
Storage, locker rooms and training space run out years before a new building can be approved, funded and built.
We design bleachers, press boxes, training rooms, locker rooms, concession stands and VIP clubs built from 20′ and 40′ shipping containers. Each design has estimated prices in three tiers. We haven’t built one yet: our first builds are planned for winter 2026–27, with deliveries in 2027.
Concept rendering · Bleacher unit
When we talked to Virginia athletic directors, the same three problems kept coming up.
Storage, locker rooms and training space run out years before a new building can be approved, funded and built.
Permanent buildings mean architects, permits and long schedules, all paid for up front.
Naming rights often go unsold or under-priced, so they don’t make much of a dent in a project’s cost.
Concept rendering · Press box
Bleachers, press boxes, training rooms, concessions and VIP suites, based on 20′ and 40′ containers.
Economy, Standard and Luxury tiers on the same design. Prices come from our cost model and are confirmed in a written quote.
Our parent company, Stadia IP, can try to sell naming rights on your facility to help cover its cost.
Select a design for renderings, plans and estimated prices in all three tiers.
All images are concept renderings. Prices are estimates per unit, delivered; site foundation, utility connection, sales tax and permits are not included. Buying several units for one site qualifies for package pricing.
Every facility comes in Economy, Standard and Luxury. The footprint and layout stay the same; the materials and equipment change.
Durable, practical finishes for programs that need the space first.
Upgraded materials and commercial-grade equipment.
Higher-end finishes for donor, sponsor and premium game-day spaces.
This fall we showed our renderings and estimated prices to athletic directors, coaches and administrators at nine Virginia high schools, colleges and parks departments, and asked what they would buy. Two said they’re interested in purchasing.
“We are on a very tight budget and I like the look of these structures. I feel they could be a budget-friendly way for us to finally get the facilities upgrades we need.”Athletic Director, Sweet Briar College
Their athletic director picked five facilities and said they plan to purchase within six months. We’re preparing a proposal.
Cool idea and nice use of containers. Would be interested in seeing [them] in person for a better feel.
This could be an option at our remote school locations that do not have concession buildings.
I would go a little higher in price to ensure we had a nice dugout, painted with good seating.
For the bleacher-style bench seating, I think this price [is] fair.
Our warehouse. We lease the former Skippy peanut butter plant at 500 Confederate Avenue in Portsmouth, which has its own rail siding and crane. Nothing has been built there yet. Our first units are planned for winter 2026–27.
Quotes are from our fall 2026 survey of Virginia athletic programs, lightly edited for spelling. Bracketed words added for clarity.
Marland Continental is part of Stadia IP, which sells naming rights and sponsorships for sports venues. If you’d like, Stadia IP will look for a local sponsor for your new facility: a business that pays to put its name on it, a wrap on its walls, or RobotLab robots at your games.
That money goes toward the facility’s cost. We can’t promise a sponsor or an amount, but we’ll give you a realistic estimate before you commit.
Concept rendering · Merchandise standTell us what your program needs. We recommend a design, size and tier.
Choose finishes and options, and decide whether to explore sponsorship funding.
In our warehouse in Portsmouth, Virginia. First builds are planned for winter 2026–27.
By truck or rail, set on a pad or piers on your site. It can be moved later.
Once our first units are built, we plan to offer season and event rentals for tournaments, renovations and programs that aren’t ready to buy. Let us know if you’d be interested.
Concept rendering · Equipment roomNot yet. We’re a pre-seed startup. We’ve designed and priced 17 facilities, surveyed Virginia athletic programs, and leased a warehouse at 500 Confederate Ave in Portsmouth. Our first builds are planned for winter 2026–27, with the first deliveries in 2027.
No. Every product image on this site is a concept rendering made to show the design. Once we build our first units, we’ll replace them with photos.
They’re estimates from our cost model, which prices the materials, equipment, labor and freight for each tier. They’re per unit and delivered, including a freight and setting allowance. They don’t include site foundation (a concrete pad typically runs $4,000–$12,000, or $1,500–$5,000 for a pier system), utility service to the pad, sales tax or local permits. Your written quote sets the final price.
Every design is based on 20′ or 40′ high-cube shipping containers. Larger ones, like the stacked bleacher unit, stacked VIP club and container stage, combine two containers with decks, canopies and stairs.
Yes. They’re built in our shop and set on site, so they can be picked up and moved to a new field or campus.
Stadia IP, our parent company, sells naming rights, wraps and sponsorships for sports venues. If you opt in, they’ll look for a sponsor for your facility, and that money goes toward its cost. Whether a sponsor signs on, and for how much, depends on your program and market, so we’ll talk through what’s realistic before you commit.
We’re starting with Virginia, North Carolina, Maryland, D.C. and Delaware, all within trucking range of Portsmouth. Our warehouse is also rail-served.
Yes. Buying several units for one site, like bleachers, a press box and a concession stand, qualifies for package pricing. Ask us for a multi-unit quote.
Pick a design to get started, or tell us what your program needs and we’ll suggest one.